Changed lines 167-169 from:
-> We also made changes in the script "Upon Opening".  You've likely changed how the script ends--that is, you've changed what layout the script goes to at the end. You'll want to copy our new version of this script's steps into your file, but then add your alterations back, going to the layout of your choice at the end. Note that you know have two potential layout endings, one for Web Direct and one for FileMaker Pro.
to:
-> We also made changes in the script "Upon Opening". If you've changed what layout the script goes to at the end, you'll want to copy our new version of this script's steps into your file, but then add your alterations back, going to the layout of your choice at the end. Note that you know have two potential layout endings, one for Web Direct and one for FileMaker Pro.

-> You'll also have to edit the "Load Calendar Settings - On Startup --- Edit Configuration Here ---" script
. If you haven't modified any of the settings in this script in your file, then you can just copy/paste the entire contents from the new file into yours (like you did with the other scripts above). However, if you have modified your settings, you'll want to remove the step that sets the $$sc_ColorDefault variable, and replace the two nested If[] clauses that follow the "Double check display graphics" comment. (You'll see a new sub script named "Load Calendar Graphics Part 2".)
June 27, 2014, at 08:19 PM by 50.132.85.96 -
Changed line 7 from:
The new web direct layouts have been added to the Pro Calendar as of version 7.5 If you have a calendar earlier than that you have two options for adding the Web Direct interface to your solutions:
to:
The new web direct layouts have been added to the Pro Calendar as of version 7.25 If you have a calendar earlier than that you have two options for adding the Web Direct interface to your solutions:
June 27, 2014, at 08:19 PM by 50.132.85.96 -
Changed line 1 from:
Note: Web Direct support is included in SeedCode calendar version 7.23 and higher. Check out our [[version history]] for more.
to:
Note: Web Direct support is included in SeedCode calendar version 7.25 and higher (version 7.25 is a paid upgrade from earlier versions). Check out our [[version history]] for more.
June 05, 2014, at 02:22 AM by 50.132.85.96 -
Changed line 19 from:
--> This is also what you'd do if you have an older calendar--older than say [[Version History | version]] 6.17. While you can paste the Web Viewer code into older calendars, you first need to bring them up to version 6.25, which is a lot of work. So re-integrating is likely the best bet unless you've made a LOT of mods to your calendar.
to:
--> This is also what you'd do if you have an older calendar--older than say [[Version History | version]] 6.17-- or if you have SeedCode Complete. While you can paste the WebDirect code into older calendars, you first need to bring them up to version 6.25, which is ''a lot'' of work. So re-integrating is likely the best bet unless you've made a LOT of mods to your calendar.
May 28, 2014, at 02:08 PM by 50.132.85.96 -
Added lines 4-5:

''These instructions will add both the new Web Direct layouts and support for FileMaker Server 13's new Perform Script on Server ([[PSOS]]).''
May 28, 2014, at 04:25 AM by 50.132.85.96 -
Changed line 1 from:
Note: The PSOS option is included in SeedCode calendar version 7.23 and higher. Check out our [[version history]] for more.
to:
Note: Web Direct support is included in SeedCode calendar version 7.23 and higher. Check out our [[version history]] for more.
May 28, 2014, at 02:59 AM by 50.132.85.96 -
Changed line 3 from:
!! How can I add the Web Direct Calendar to my existing calendar deployment?
to:
!! How can I add the Web Direct calendar to my existing calendar deployment?
May 28, 2014, at 02:58 AM by 50.132.85.96 -
Changed line 1 from:
Note: SeedCode's [[http://www.seedcode.com/preview-seedcode-calendar-web-direct/ | Calendar for Web Direct]] is almost ready. [[http://www.seedcode.com/newsletter-signup/ | Signup for our newsletter]] to be the first to know when it's launched.
to:
Note: The PSOS option is included in SeedCode calendar version 7.23 and higher. Check out our [[version history]] for more.
May 27, 2014, at 04:20 PM by 50.132.85.96 -
Changed lines 122-126 from:
-> There is only one existing calendar field that has changed in this new version. Please edit the field CalendarRows::CalendarColorReptCalc and replace it's definition with that copied from the new calendar you just downloaded.

-> Note that you'll also be changing this field type from Text to Container. ''Don't forget to do that''.

-> After making this change the colors in your calendar won't appear correctly until the end of our integration here, but don't worry.
to:
-> There area only two existing calendar fields that have changed in this new version. Please edit the fields CalendarRows::CalendarColorReptCalc and SampleEvents::z_sc_ColorCalc and replace their definitions with those copied from the new calendar you just downloaded.

-> Note that you'll also be changing this field type of each from Text to Container. ''Don't forget to do that''.

-> After making these changes the colors in your calendar won't appear correctly until the end of our integration here, but don't worry.
May 27, 2014, at 01:12 AM by 50.132.85.96 -
Changed lines 203-205 from:
-> In order to get your new colors looking correct in the Desktop calendar layouts you'll need to make a formatting change to each tab of the calendar. This is best explained in a video, so watch this:

-> https://www
.youtube.com/watch?v=Bc6OXOO10YU
to:
-> In order to get your new colors looking correct in the Desktop calendar layouts you'll need to make a formatting change to each tab of the calendar. If you haven't modified your layouts extensively you might want to just copy and paste the layout content from the new file. But if you want to mod your existing layouts, the method is is best explained in a video, so please watch this:

-> https://www.youtube.com/watch
?v=juVxU5BtBSA
May 26, 2014, at 11:51 PM by 50.132.85.96 -
Changed line 205 from:
-> Completed Upload: https://www.youtube.com/watch?v=Bc6OXOO10YU
to:
-> https://www.youtube.com/watch?v=Bc6OXOO10YU
May 26, 2014, at 11:47 PM by 50.132.85.96 -
Changed lines 205-207 from:
-> http://screencast.com/t/vJhYGBKOgciS

 > > Simple day
to:
-> Completed Upload:  https://www.youtube.com/watch?v=Bc6OXOO10YU
May 26, 2014, at 10:33 PM by 50.132.85.96 -
Changed line 124 from:
-> Note that you'll also be changing this field type from Text to Container.
to:
-> Note that you'll also be changing this field type from Text to Container. ''Don't forget to do that''.
May 26, 2014, at 10:31 PM by 50.132.85.96 -
Changed lines 195-196 from:
-> If you do, congratulations, you'll just clean up a few layouts below before you're all done. If you don't see your events, double check that you added the script triggers in step 6 above. If you did and you still don't see things working, please [[http://www.seedcode.com/contact/ | get in touch]]--we'll ask you to send us a copy of your files and we can likely determine what's wrong.
to:
-> If you do, congratulations, you'll just clean up a few layouts below before you're all done. If you don't see your events, double check that you added the script triggers in step 6 above. If you did and you still don't see things working, please take a look at our [[troubleshooting]] page or [[http://www.seedcode.com/contact/ | get in touch]]--we'll ask you to send us a copy of your files and we can likely determine what's wrong.
Changed line 203 from:
-> In order to get your new colors looking correct in the Desktop calendar layouts you'll need to make a formatting change to each tab of the calendar. (better video coming)
to:
-> In order to get your new colors looking correct in the Desktop calendar layouts you'll need to make a formatting change to each tab of the calendar. This is best explained in a video, so watch this:
May 26, 2014, at 10:18 PM by 50.132.85.96 -
Changed line 187 from:
-> When you can see colors in the pallets you'll want to assign some colors to your statuses as the ones you've previously assigned won't be there anymore. Assign colors to your statuses, then click "apply" and continue with the instructions below. You're almost done. If you want to use colors that aren't here, create any little 20px x 20px swatch of color (even a FileMaker colored rectangle will do) and paste it in along side your status.
to:
-> When you can see colors in the pallets you'll want to assign some colors to your statuses as the ones you've previously assigned won't be there anymore. Assign colors to your statuses, then click "apply" and continue with the instructions below. You're almost done. If you want to use colors that aren't here, create any little 20px x 20px swatch of color (even a FileMaker colored rectangle will do) and paste it in along side your status. At this point your Web Direct layouts should look good but your original calendar layouts still need some cleaning up.
May 26, 2014, at 09:59 PM by 50.132.85.96 -
Changed lines 51-52 from:
-> This is most easily done by creating the first layout listed below, deleting the header and footer part, and duplicating it to create the others. Here is how to create that first layout:
to:
-> This is most easily done by creating the first layout listed below, and duplicating it to create the others. Here is how to create that first layout:
Added lines 54-55:

--> Delete the header and footer part. Make the layout body white.
May 26, 2014, at 09:55 PM by 50.132.85.96 -
Changed line 98 from:
-> Lastly there is one new field to create in the CalendarColors table. Add a container field named "ColorContainer".
to:
-> Lastly there is '''one new field to create''' in the CalendarColors table. Add a container field named "ColorContainer".
May 26, 2014, at 09:52 PM by 50.132.85.96 -
Changed lines 181-183 from:
-> You've already got the fields and scripts in place for this. Now you just need to replace the objects on the layout "Assign Colors" with the objects from that layout in the new version of the calendar. When you enter browse mode you likely won't see any colors in the "Color Pallets" side of the screen. No problem: run the script "Upon Opening". This may tell you it needs to update some colors and that this could take a few minutes. Go ahead and agree to that.
to:
-> You've already got the fields and scripts in place for this. Now you just need to replace the objects on the layout "Assign Colors" with the objects from that layout in the new version of the calendar. Go do that now.

-> Once you have, when
you enter browse mode you likely won't see any colors in the "Color Pallets" side of the screen. No problem: run the script "Upon Opening". This may tell you it needs to update some colors and that this could take a few minutes. Go ahead and agree to that.
May 26, 2014, at 09:49 PM by 50.132.85.96 -
Added lines 174-175:

-> If you've imported our alternate themes you'll also want to add a body color to the bodies of the "...Dark" and "...Bright" layouts, employing the body color used in the original layout.
May 26, 2014, at 09:45 PM by 50.132.85.96 -
Added line 81:
-> Now change those last two layouts to the alternate themes "SC WDirect Cal Dark" and "...Bright" (if you've added them).
May 26, 2014, at 09:37 PM by 50.132.85.96 -
Changed line 170 from:
-> While the layout heights in FileMaker 13 take care of themselves automatically, the layout widths do not. You'll need to manually move the right edge of the layout out to the same place it is on the layouts in our file (for most layouts this at 1170px).
to:
-> While the layout heights in FileMaker 13 take care of themselves automatically, the layout widths do not. You'll need to manually move the right edge of the layout out to the same place it is on the layouts in our file (for most layouts this at 1170px, though there are often objects extending past that to the right).
May 26, 2014, at 09:33 PM by 50.132.85.96 -
Changed line 170 from:
-> While the layout heights in FileMaker 13 take care of themselves automatically, the layout widths do not. You'll need to manually move the right edge of the layout out to the same place it is on the layouts in our file (for most layouts this at 1169px).
to:
-> While the layout heights in FileMaker 13 take care of themselves automatically, the layout widths do not. You'll need to manually move the right edge of the layout out to the same place it is on the layouts in our file (for most layouts this at 1170px).
May 26, 2014, at 09:28 PM by 50.132.85.96 -
Changed line 170 from:
-> While the layout heights in FileMaker 13 take care of themselves automatically, the layout widths do not. You'll need to manually move the right edge of the layout out to the same place it is on the layouts in our file (for most layouts this is flush with the rightmost object edge).
to:
-> While the layout heights in FileMaker 13 take care of themselves automatically, the layout widths do not. You'll need to manually move the right edge of the layout out to the same place it is on the layouts in our file (for most layouts this at 1169px).
May 26, 2014, at 07:47 PM by 50.132.85.96 -
Changed line 131 from:
-> Once all the new scripts are in place you can return to the layouts created in step 3 and assign two script triggers to each of them except the last one (except for "Calendar Color Records Part 2") :
to:
-> Once all the new scripts are in place you can return to the layouts created in step 3 and assign two script triggers to each of them except layout "Calendar Color Records Part 2":
May 26, 2014, at 07:42 PM by 50.132.85.96 -
Changed line 115 from:
%center%  %newwin width=300px%[[http://www.seedcode.com/rootimages/stikipad/pro12/WDrelationships.png | http://www.seedcode.com/rootimages/stikipad/pro12/WDrelationships.png]]
to:
%center%  %newwin width=500px%[[http://www.seedcode.com/rootimages/stikipad/pro12/WDrelationships.png | http://www.seedcode.com/rootimages/stikipad/pro12/WDrelationships.png]]
May 26, 2014, at 07:42 PM by 50.132.85.96 -
Changed lines 113-115 from:
-> Double check your work against the relationship graph in the new copy of the calendar you've downloaded.
to:
-> Double check your work against the relationship graph in the new copy of the calendar you've downloaded. You should be able to arrange your relationships (at least the calendar interface side) to look exactly like ours:

%center%  %newwin width=300px%[[http://www.seedcode.com/rootimages/stikipad/pro12/WDrelationships.png | http://www.seedcode.com/rootimages/stikipad/pro12/WDrelationships.png]]
May 26, 2014, at 07:36 PM by 50.132.85.96 -
Changed lines 103-111 from:
--> From "CalendarRows::Common" to "GanttBars::Common". No creation options needed.

--> From "CalendarInterface::Preview_SelectedColorFieldValue_Glob" to "CalendarInterfaceColors::Name". No creation options needed.

--> From "CalendarInterface::Preview_SelectedID" to "ToDoList::ID" where the ToDoList side has "Allow creation..." turned on.

-> Finally edit the relationship you may already have between CalendarInterface and SampleEvents (or whatever you're calling your events table:

--> From "CalendarInterface::Preview_SelectedID" to "SampleEvents::ID" where the ToDoList side has "Allow creation..." turned on.
to:
--> From "CalendarRows::Common" = "GanttBars::Common". No creation options needed.

--> From "CalendarInterface::Preview_SelectedColorFieldValue_Glob" = "CalendarInterfaceColors::Name". No creation options needed.

--> From "CalendarInterface::Preview_SelectedID" = "ToDoList::ID" where the ToDoList side has "Allow creation..." turned on.

-> Finally delete the relationship you may already have between CalendarRows and SampleEvents (or whatever you're calling your events table) and create this relationship instead:

--> From "CalendarInterface::Preview_SelectedID" to "SampleEvents::ID" where the SampleEvents side has "Allow creation..." turned on.
May 26, 2014, at 07:31 PM by 50.132.85.96 -
Changed line 91 from:
---> %center% (There are even more fields than shown here: your last field will be "timepickerdown")
to:
---> (There are even more fields than shown here: your last field will be "timepickerdown")
May 26, 2014, at 07:31 PM by 50.132.85.96 -
Changed line 91 from:
-> %center% There are even more fields than shown here: your last field will be "timepickerdown"
to:
---> %center% (There are even more fields than shown here: your last field will be "timepickerdown")
May 26, 2014, at 07:30 PM by 50.132.85.96 -
Changed lines 89-91 from:
%center%  %newwin width=300px%[[http://www.seedcode.com/rootimages/stikipad/pro12/CalInterfaceFields.png | http://www.seedcode.com/rootimages/stikipad/pro12/CalInterfaceFields.png]] There are even more fields than shown here: your last field will be "timepickerdown"
to:
%center%  %newwin width=300px%[[http://www.seedcode.com/rootimages/stikipad/pro12/CalInterfaceFields.png | http://www.seedcode.com/rootimages/stikipad/pro12/CalInterfaceFields.png]] 

-> %center%
There are even more fields than shown here: your last field will be "timepickerdown"
May 26, 2014, at 07:30 PM by 50.132.85.96 -
Changed line 89 from:
%center%  %newwin width=300px%[[http://www.seedcode.com/rootimages/stikipad/pro12/CalInterfaceFields.png | http://www.seedcode.com/rootimages/stikipad/pro12/CalInterfaceFields.png]]
to:
%center%  %newwin width=300px%[[http://www.seedcode.com/rootimages/stikipad/pro12/CalInterfaceFields.png | http://www.seedcode.com/rootimages/stikipad/pro12/CalInterfaceFields.png]] There are even more fields than shown here: your last field will be "timepickerdown"
May 26, 2014, at 07:28 PM by 50.132.85.96 -
May 26, 2014, at 07:28 PM by 50.132.85.96 -
Added lines 80-81:

-> Get in the habit of pausing after every step to backup your file.
May 26, 2014, at 07:22 PM by 50.132.85.96 -
Changed line 53 from:
--> Create the layout and then visit Layout Setup and uncheck the box beside "Show field frames when record is active".
to:
--> Create the layout and then visit Layout Setup and uncheck the box beside "Show field frames when record is active".  Click on the views tab and disable all but form view.
May 26, 2014, at 07:21 PM by 50.132.85.96 -
Changed line 57 from:
--> Switch the "Show records from" drop-down to make the layout based on "Calendar Interface" (all the layouts below will be based on this).
to:
--> Switch the "Show records from" drop-down to make the layout based on "CalendarInterface" (all the layouts below will be based on this).
May 26, 2014, at 07:19 PM by 50.132.85.96 -
Changed lines 77-79 from:
Calendar Color Records Part 2
to:
Calendar Color Records Part 2\\
Calendar - Week View Dark\\
Calendar - Week View Bright
May 20, 2014, at 08:55 PM by 65.102.176.83 -
Changed line 200 from:
-> vsfvsf
to:
-> You'll see that the Splash layout in the new calendar is pretty simple and devoid of gradients. We did this to make the first-open experience in Web Direct as fast as possible. I'd suggest doing the same with your splash layout, but you can see how it feels and simplify it only if you need to.
May 20, 2014, at 07:56 PM by 65.102.176.83 -
Changed lines 196-198 from:
-> vsfvsf

 > > video
to:
-> The details of your events are shown in a popover in Web Direct. You'll follow the instructions here to format these popovers to show fields from your records: [[Event Popovers | Formatting Event Popovers]].
May 20, 2014, at 07:40 PM by 65.102.176.83 -
Changed line 23 from:
'''Overview'''
to:
'''Tips'''
May 20, 2014, at 07:39 PM by 65.102.176.83 -
Changed lines 5-7 from:
 > > Should you paste the web cal layouts in or re-integrate the whole calendar?

 > > If you linked: re-integrate. If
you embedded, paste.
to:
The new web direct layouts have been added to the Pro Calendar as of version 7.5 If you have a calendar earlier than that you have two options for adding the Web Direct interface to your solutions:

-> '''Paste the new code into your version.'''

--> Pasting can be a lot of work, but it's not hard work and the instructions which follow will walk you through it step-by step. This is way to go if you've pasted the calendar into your file ("embedded" it, instead of "linking" it).

--> This is also the way to go if you've heavily modified your instance of the calendar, as re-integrating would mean those mods need to be redone.

-> '''Re-integrate the new calendar with your database.'''

--> This is a more compelling option if you've linked the calendar to your file instead of embedding it. If you then link this new calendar (again, instead of embedding it) you'll skip the somewhat tedious layout creation needed to get all the Web Direct layouts into your file.

--> This is also what you'd do if you have an older calendar--older than say [[Version History | version]] 6.17. While you can paste the Web Viewer code into older calendars, you first need to bring them up to version 6.25, which is a lot of work. So re-integrating is likely the best bet unless you've made a LOT of mods to your calendar.

-->If this is what you'd like to do, simply follow the "linking" instructions here: [[Quick Integration]]
.
May 20, 2014, at 01:10 AM by 50.132.85.96 -
Changed lines 47-48 from:
-> Keep duplicating and renaming layouts until you're through the list below. Don't rename any layouts now--even if you'd like to--you can rename them after you're up and running, providing your abide by a few rules [[Layout Names | here]]. Make sure layout names are spelled ''exactly'' as they are below.
to:
-> Keep duplicating and renaming layouts until you're through the list below. Don't assign your own names to any layouts now--even if you'd like to--you can rename them again after you're up and running, providing your abide by a few rules [[Layout Names | here]]. Make sure layout names are spelled ''exactly'' as they are below.
Changed line 50 from:
Calendar - Day View - so Side Menu\\
to:
Calendar - Day View - no Side Menu\\
Changed line 52 from:
Calendar - Day Simple View - so Side Menu\\
to:
Calendar - Day Simple View - no Side Menu\\
Changed line 54 from:
Calendar - Week View - so Side Menu\\
to:
Calendar - Week View - no Side Menu\\
Changed line 56 from:
Calendar - Week Simple View - so Side Menu\\
to:
Calendar - Week Simple View - no Side Menu\\
Changed line 58 from:
Calendar - Month View - so Side Menu\\
to:
Calendar - Month View - no Side Menu\\
Changed line 60 from:
Calendar - Schedule View - so Side Menu\\
to:
Calendar - Schedule View - no Side Menu\\
Changed line 62 from:
Calendar - Grid View - so Side Menu\\
to:
Calendar - Grid View - no Side Menu\\
Changed line 64 from:
Calendar - Gantt View - so Side Menu\\
to:
Calendar - Gantt View - no Side Menu\\
May 20, 2014, at 12:57 AM by 50.132.85.96 -
Changed lines 158-160 from:
-> You've already got the fields and scripts in place for this. Now you just need to replace the objects on the layout "Assign Colors" with the objects from that layout in the new version of the calendar.

-> Once this is done, run the script "Upon Opening". This may tell you it needs to update some colors and that this could take a few minutes. Go ahead and agree
to that. When it's complete you'll want to assign some colors to your statuses as the ones you've previously assigned won't work anymore. In the desktop calendar (you can't assign colors in Web Direct) click on Settings in the left hand sidebar and then click "assign colors" or just head to the "Assign Colors" layout by hand. Assign colors to your statuses, then click "apply" and continue with the instructions below. You're almost done.
to:
-> You've already got the fields and scripts in place for this. Now you just need to replace the objects on the layout "Assign Colors" with the objects from that layout in the new version of the calendar. When you enter browse mode you likely won't see any colors in the "Color Pallets" side of the screen. No problem: run the script "Upon Opening". This may tell you it needs to update some colors and that this could take a few minutes. Go ahead and agree to that.

-> When
you can see colors in the pallets you'll want to assign some colors to your statuses as the ones you've previously assigned won't be there anymore. Assign colors to your statuses, then click "apply" and continue with the instructions below. You're almost done. If you want to use colors that aren't here, create any little 20px x 20px swatch of color (even a FileMaker colored rectangle will do) and paste it in along side your status.
May 20, 2014, at 12:52 AM by 50.132.85.96 -
Changed lines 162-163 from:
'''Step 10 of 10: Cleaning Up''
to:
'''Step 10 of 10: Cleaning Up'''
Added lines 172-173:
There are a few more things you'll want to do--some more layouts you'll want to edit--now that you have the guts of the new calendar working.
Changed lines 186-188 from:
'''Simplifying your Splash layout for Web Direcy'''
to:
 > > video

'''Simplifying your Splash layout for Web Direct
'''
May 20, 2014, at 12:48 AM by 50.132.85.96 -
Changed lines 18-19 from:
'''Step 1 of 11: Table Occurrence Changes'''
to:
'''Step 1 of 10: Table Occurrence Changes'''
Changed lines 31-32 from:
'''Step 2 of 11: Import Theme(s)'''
to:
'''Step 2 of 10: Import Theme(s)'''
Changed lines 35-38 from:
'''Step 3 of 11: New Blank Layouts'''

-> FileMaker is really sensitive to the order of the following operations. In this step we'll create blank layouts with the correct layout names, and then after we've pasted in the scripts that refer to these layouts we'll return to paste the calendar objects on to these layouts in step 9.
to:
'''Step 3 of 10: New Blank Layouts'''

-> FileMaker is really sensitive to the order of the following operations. In this step we'll create blank layouts with the correct layout names, and then after we've pasted in the scripts that refer to these layouts we'll return to paste the calendar objects on to these layouts in step 8.
Changed lines 67-68 from:
'''Step 4 of 11: New Fields & Relationships'''
to:
'''Step 4 of 10: New Fields & Relationships'''
Changed lines 97-98 from:
'''Step 5 of 11: Changed Fields'''
to:
'''Step 5 of 10: Changed Fields'''
Changed lines 105-106 from:
'''Step 6 of 11: New Scripts'''
to:
'''Step 6 of 10: New Scripts'''
Changed lines 116-117 from:
'''Step 7 of 11: Changed Scripts'''
to:
'''Step 7 of 10: Changed Scripts'''
Changed lines 144-145 from:
'''Step 9 of 11: New Layout Contents'''
to:
'''Step 8 of 10: New Layout Contents'''
Changed lines 154-155 from:
'''Step 10 of 11: Change the contents of a couple existing layouts .'''
to:
'''Step 9 of 10: Change the contents of a couple existing layouts .'''
Changed lines 162-167 from:
'''Step 11 of 11: Formatting the Event Popover to match your data'''

-> Coming Soon.

!! Changes to Existing Pro Calendar Layouts
.
to:
'''Step 10 of 10: Cleaning Up''

-> There are a few things you
'll want to clean up in the next section, but having run the Upon Opening script in the step above you should now see the web direct layouts working. 

-> From the layout menu select any of the "Calendar... View" layouts you pasted in from the new calendar and you should see your events in them.

-> If you do, congratulations, you'll just clean up a few layouts below before you're all done. If you don't see your events, double check that you added the script triggers in step 6 above. If you did and you still don't see things working, please [[http://www.seedcode.com/contact/ | get in touch]]--we'll ask you to send us a copy of your files and we can likely determine what's wrong.

!! Cleaning Up.

'''Changing the way colors are displayed on your old calendar layouts.'''

Changed lines 180-181 from:

'''Splash'''
to:
'''Formatting the Event Popover to match your data'''

-> vsfvsf

'''Simplifying your Splash layout for Web Direcy
'''
May 20, 2014, at 12:38 AM by 50.132.85.96 -
Changed lines 156-159 from:
-> Assign Colors

-> Splash

to:
-> As you know, the Web Direct calendar introduces a new way for us to render our event colors: we're now doing these as container fields instead of colored text. You can switch the desktop calendar to use this method as well--and you'll want to so that you only have one place to define color.

-> You've already got the fields and scripts in place for this. Now you just need to replace the objects on the layout "Assign Colors" with the objects from that layout in the new version of the calendar.

-> Once this is done, run the script "Upon Opening". This may tell you it needs to update some colors and that this could take a few minutes. Go ahead and agree to that. When it's complete you'll want to assign some colors to your statuses as the ones you've previously assigned won't work anymore. In the desktop calendar (you can't assign colors in Web Direct) click on Settings in the left hand sidebar and then click "assign colors" or just head to the "Assign Colors" layout by hand. Assign colors to your statuses, then click "apply" and continue with the instructions below. You're almost done.

Changed lines 166-173 from:
!! Changes to Pro Calendar Stuff.

'''Colors'''

-> The Web Direct calendar introduces a new way for us to render our event colors: we're now doing these as container fields instead of colored text. You can switch the desktop calendar to use this method as well--and you'll want to so that you only have one place to define color.

-> To accomplish this, change your definition for the field CalendarRows::CalendarColorReptCalc to use the definition from our latest Pro Calendar. Once you do, you'll want to assign some colors as the ones you've previously assigned won't work anymore. In the desktop calendar (you can't assign colors in Web Direct) click on Settings in the left hand sidebar and then click "assign colors". Assign colors to your items then click "apply and close" and continue with the instructions below
.
to:
!! Changes to Existing Pro Calendar Layouts.
Changed lines 170-177 from:
http://screencast.com/t/vJhYGBKOgciS
to:
-> http://screencast.com/t/vJhYGBKOgciS

 > > Simple day


'''Splash'''

-> vsfvsf
May 19, 2014, at 10:54 PM by 50.132.85.96 -
Changed line 140 from:
Halt Layout Based Script Triggers\\
to:
Halt Layout Based Script Triggers
May 19, 2014, at 10:52 PM by 50.132.85.96 -
Changed lines 116-117 from:
'''Step 7 of 11:Changed Scripts'''
to:
'''Step 7 of 11: Changed Scripts'''
Changed lines 142-144 from:
Upon Opening
Load Calendar Settings - On Startup --- Edit Configuration Here
---
to:
-> We also made changes in the script "Upon Opening".  You've likely changed how the script ends--that is, you've changed what layout the script goes to at the end. You'll want to copy our new version of this script's steps into your file, but then add your alterations back, going to the layout of your choice at the end. Note that you know have two potential layout endings, one for Web Direct and one for FileMaker Pro.
May 19, 2014, at 10:45 PM by 50.132.85.96 -
Changed lines 118-144 from:
 > > =)
to:
-> The following scripts have been changed in the new calendar, either to accommodate Web Direct or to fix bugs. These are not scripts you've likely changed so please copy the contents of each of the following scripts from the new file and paste it into your file replacing the steps in your versions of these scripts:

--> Check System Formats\\
Demo Date\\
Apply Color Settings { Close ; DontRefresh }\\
Load Calendar Layout\\
Toggle Use Simlple Views\\
Switch to Simple View?\\
Date Previous\\
Date Next\\
Date Specific ( Date )\\
Time Earlier\\
Time Later\\
Refresh Calendar\\
Insert into Calendar { Column }\\
Insert into Calendar - Write Event { No Content }\\
Load records into Gantt Chart\\
Date Zoom in on Gantt\\
Date Zoom out on Gantt\\
Gantt Date Range ( Spread )\\
Create Edit Delete Event ( SourceNo ) { Operation , Hide, DateStart , DateEnd , TimeStart ... }\\
Load Calendar Color Coding\\
Halt Layout Based Script Triggers\\

Upon Opening
Load Calendar Settings - On Startup --- Edit Configuration Here ---

May 19, 2014, at 10:34 PM by 50.132.85.96 -
Added lines 117-118:

 > > =)
May 19, 2014, at 10:32 PM by 50.132.85.96 -
Added lines 79-80:
-> Lastly there is one new field to create in the CalendarColors table. Add a container field named "ColorContainer".
Changed lines 107-111 from:
-> Coming Soon.

-> Now return to the layouts created in step 3 and assign two script triggers to each of them except the last one (except for "Calendar Color Records Part 2") :
--> On RecordLoad  run the script "Load Calendar Layout"
--> On RecordCommit
  run the script "Event On Commit"
to:
-> Copy the folder of scripts named "New Scripts for Web Direct" from our new version of the calendar and paste or import it into your file.

-> It is unlikely that you have any scripts in your solution with exactly the same names as these, but if you do it will cause problems. So find FileMaker's  Import.log file (in the same folder as your FileMaker file, or in the FileMaker application folder) and scan the recent entries for the scripts you just imported. If you see any without "0" errors, change the name of your original script, then rename our newly created script, removing "copy" from its name.

-> Once all the new scripts are in place you can return to the layouts created in step 3 and assign two script triggers to each of them except the last one (except for "Calendar Color Records Part 2") :

--> '''OnRecordLoad'''  run the script "Load Calendar Layout"
--> '''OnRecordCommit'''
  run the script "Event On Commit"
May 19, 2014, at 09:39 PM by 50.132.85.96 -
Changed lines 5-7 from:
'''Overall Instructions.'''

-
> Coming Soon.
to:
 > > Should you paste the web cal layouts in or re-integrate the whole calendar?

 > > If you linked: re-integrate
. If you embedded, paste.

!! Pasting the Web Direct Calendar into your Calendar

'''Overview'''
May 19, 2014, at 09:37 PM by 50.132.85.96 -
Deleted lines 26-27:
-> Coming Soon.
Changed lines 75-89 from:
-> Once those fields are in place you can return to the Relationships tab and wire up XXXXXXXX
to:
-> Once those fields are in place you can return to the Relationships tab of Manage Database and create relationships to the two new table occurrences you created in step 1.

-> Please create the following relationships:

--> From "CalendarRows::Common" to "GanttBars::Common". No creation options needed.

--> From "CalendarInterface::Preview_SelectedColorFieldValue_Glob" to "CalendarInterfaceColors::Name". No creation options needed.

--> From "CalendarInterface::Preview_SelectedID" to "ToDoList::ID" where the ToDoList side has "Allow creation..." turned on.

-> Finally edit the relationship you may already have between CalendarInterface and SampleEvents (or whatever you're calling your events table:

--> From "CalendarInterface::Preview_SelectedID" to "SampleEvents::ID" where the ToDoList side has "Allow creation..." turned on.

-> Double check your work against the relationship graph in the new copy of the calendar you've downloaded.
May 19, 2014, at 09:27 PM by 50.132.85.96 -
Added lines 18-26:
-> You'll add two new table occurrences to the relationship graph in order to support the Web Direct features of the new calendar. Both are instances of tables you already have (i.e. there are no new tables to make).

-> Navigate to the Relationships tab of the Manage Database window and click the "+" button in the lower left to create each of these new table occurrences:

--> "GanttBars" based on the table CalendarInterface
--> "CalendarInterfaceColors" based on CalendarColors.

-> Don't connect these to anything now, we'll do that in step 4 below.

Changed line 65 from:
'''Step 4 of 11: New Fields'''
to:
'''Step 4 of 11: New Fields & Relationships'''
May 19, 2014, at 08:24 PM by 50.132.85.96 -
Added lines 67-68:

-> Once those fields are in place you can return to the Relationships tab and wire up XXXXXXXX
May 19, 2014, at 08:19 PM by 50.132.85.96 -
Changed lines 60-61 from:
-> For the CalendarInterface table...
to:
-> For the CalendarInterface table (click for a larger image)...
Added lines 63-66:

-> For the CalendarRows table (click for a larger image)...

%center%  %newwin width=300px%[[http://www.seedcode.com/rootimages/stikipad/pro12/CalendarRowsFields.png | http://www.seedcode.com/rootimages/stikipad/pro12/CalendarRowsFields.png]]
May 19, 2014, at 08:12 PM by 50.132.85.96 -
Changed lines 60-62 from:
xbdf
to:
-> For the CalendarInterface table...

%center%  %newwin width=300px%[[http://www.seedcode.com/rootimages/stikipad/pro12/CalInterfaceFields.png | http://www.seedcode.com/rootimages/stikipad/pro12/CalInterfaceFields.png]]
May 19, 2014, at 08:00 PM by 50.132.85.96 -
Changed lines 56-75 from:
'''Step 4 of 11: New Fields''' (create them in this order or copy and paste if using using FileMaker Pro Advanced):
 
-->
CalendarInterface::borderIMG_Overlap\\
CalendarInterface::borderIMG_Line\\
CalendarInterface::borderIMG_Line_Overlap\\
CalendarInterface::border\\
CalendarInterface::TimeDisplayCalc_Hour13\\
CalendarInterface::TimeDisplayCalc_Minute13\\
CalendarInterface::ThreeMoDisplay13Calc\\
CalendarInterface::Preview_SelectedColorFieldValue_Glob\\
CalendarInterface::SourceDisplayCalc\\
CalendarInterface::checkGreen\\
CalendarInterface::checkGrey\\
CalendarInterface::SourceDisplayIconCalc\\
CalendarInterface::ThreeMoDisplayFocusGlob\\
CalendarInterface::ColorContainerHoldersGlob

->
CalendarRows::disp\\
CalendarRows::clr\\
CalendarRows::bdr\\
to:
'''Step 4 of 11: New Fields'''

-> The new Web Direct calendar requires a whole slew of new fields to be added to the
CalendarInterface and CalendarRows tables. The easiest way to do this is to open the new version of the calendar you've downloaded, sort the fields by creation order, and copy the fields shown in blue below; then paste these into the tables in you file.

xbdf
May 19, 2014, at 07:41 PM by 50.132.85.96 -
Changed lines 14-15 from:
'''Step 1 of 10: Table Occurrence Changes'''
to:
'''Step 1 of 11: Table Occurrence Changes'''
Changed lines 20-21 from:
'''Step 2 of 10: Import Theme(s)'''
to:
'''Step 2 of 11: Import Theme(s)'''
Changed lines 24-27 from:
'''Step 3 of 10: New Blank Layouts'''

-> FileMaker is really sensitive to the order of the following operations. In this step we'll create blank layouts with the correct layout names, and then after we've pasted in the scripts that refer to these layouts we'll return to paste the calendar objects on to these layouts in step 7.
to:
'''Step 3 of 11: New Blank Layouts'''

-> FileMaker is really sensitive to the order of the following operations. In this step we'll create blank layouts with the correct layout names, and then after we've pasted in the scripts that refer to these layouts we'll return to paste the calendar objects on to these layouts in step 9.
Changed line 56 from:
'''Step 4 of 10: New Fields''' (create them in this order or copy and paste if using using FileMaker Pro Advanced):
to:
'''Step 4 of 11: New Fields''' (create them in this order or copy and paste if using using FileMaker Pro Advanced):
Changed lines 77-78 from:
'''Step 5 of 10: New Scripts'''
to:
'''Step 5 of 11: Changed Fields'''

-> There is only one existing calendar field that has changed in this new version. Please edit the field CalendarRows::CalendarColorReptCalc and replace it's definition with that copied from the new calendar you just downloaded.

-> Note that you'll also be changing this field type from Text to Container.

-> After making this change the colors in your calendar won't appear correctly until the end of our integration here, but don't worry.
 
'''Step 6 of 11
: New Scripts'''
Changed lines 93-96 from:
'''Step 6 of 10:Changed Scripts'''

'''Step 7 of 10: New Layout Contents'''
to:
'''Step 7 of 11:Changed Scripts'''

'''Step 9 of 11: New Layout Contents'''
Changed lines 105-106 from:
'''Step 8 of 10: Change the contents of a couple existing layouts .'''
to:
'''Step 10 of 11: Change the contents of a couple existing layouts .'''
Changed line 111 from:
'''Step 9 of 10: Formatting the Event Popover to match your data'''
to:
'''Step 11 of 11: Formatting the Event Popover to match your data'''
May 19, 2014, at 06:55 PM by 50.159.68.116 -
Changed line 58 from:
-> CalendarInterface::borderIMG_Overlap\\
to:
--> CalendarInterface::borderIMG_Overlap\\
May 19, 2014, at 06:47 PM by 50.159.68.116 -
Deleted lines 95-96:

May 19, 2014, at 06:46 PM by 50.159.68.116 -
Changed lines 9-10 from:
'''Step 1 of 8: Table Occurrence Changes'''
to:
One tip: the most common mistake folks make integrating the calendar (or moving any FMP code from file to file) is not performing steps in order. FileMaker is very sensitive to the order in which new code is pasted into a file--create layouts before you paste in a script looking for that layout and all will be well; past the script in before the layout expected in that script has been created and you'll have some busted code that is particularly hard to unravel.

So, even if you're an experienced developer, follow the steps here carefully and in order--at for your first calendar. =)


'''Step 1 of 10
: Table Occurrence Changes'''
Changed lines 20-21 from:
'''Step 2 of 8: Import Theme(s)'''
to:
'''Step 2 of 10: Import Theme(s)'''
Changed lines 24-25 from:
'''Step 3 of 8: New Blank Layouts'''
to:
'''Step 3 of 10: New Blank Layouts'''
Changed line 56 from:
'''Step 4 of 8: New Fields''' (create them in this order or copy and paste if using using FileMaker Pro Advanced):
to:
'''Step 4 of 10: New Fields''' (create them in this order or copy and paste if using using FileMaker Pro Advanced):
Changed lines 77-78 from:
'''Step 5 of 8: New Scripts'''
to:
'''Step 5 of 10: New Scripts'''
Changed lines 85-94 from:
'''Step 6 of 8:Changed Scripts'''

'''Step 7 of 8: New Layout Contents'''

-> Now that we've imported all the requisite scripts, we can revisit each of the layouts created in step 3 and pasted the calendar objects on to that layout.

-> For each of the blank layouts

'''Step 8 of 8:
Change the contents of a couple existing layouts .'''
to:
'''Step 6 of 10:Changed Scripts'''

'''Step 7 of 10: New Layout Contents'''

-> Now that we've imported all the requisite scripts, we can revisit each of the layouts created in step 3 and paste the calendar objects on to that layout.

-> You'll be warned that you'll be increasing the height of each layout; that's OK.

-> While the layout heights in FileMaker 13 take care of themselves automatically, the layout widths do not. You'll need to manually move the right edge of the layout out to the same place it is on the layouts in our file (for most layouts this is flush with the rightmost object edge).

%center%  http://www.seedcode.com/rootimages/stikipad/pro12/layoutwidth.png



'''Step 8 of 10
: Change the contents of a couple existing layouts .'''
Added lines 105-107:
'''Step 9 of 10: Formatting the Event Popover to match your data'''

-> Coming Soon.
May 19, 2014, at 06:42 PM by 50.159.68.116 -
Changed lines 21-22 from:
-> FileMaker is really sensitive to the order of the following operations. In this step we'll create blank layouts with the correct layout names, and then after we've pasted in the scripts that refer to these layouts we'll return to paste the calendar objects on to these layouts in step 5.
to:
-> FileMaker is really sensitive to the order of the following operations. In this step we'll create blank layouts with the correct layout names, and then after we've pasted in the scripts that refer to these layouts we'll return to paste the calendar objects on to these layouts in step 7.
Changed lines 80-87 from:
'''Changed Scripts'''

'''New Layout Contents'''

-> Coming Soon.

'''Change the contents of existing layouts.'''
to:
'''Step 6 of 8:Changed Scripts'''

'''Step 7 of 8: New Layout Contents'''

-> Now that we've imported all the requisite scripts, we can revisit each of the layouts created in step 3 and pasted the calendar objects on to that layout.

-> For each of the blank layouts

'''Step 8 of 8: Change the contents of a couple existing layouts
.'''
Added lines 91-92:

-> Splash
May 19, 2014, at 06:29 PM by 50.159.68.116 -
Changed lines 9-11 from:
'''Table Occurrence Changes'''
to:
'''Step 1 of 8: Table Occurrence Changes'''

-> Begin by backing up your file (really).
May 19, 2014, at 06:28 PM by 50.159.68.116 -
Changed lines 49-51 from:
--> Lastly, please remove the script trigger from that last layout.

'''
New Fields''' (create them in this order or copy and paste if using using FileMaker Pro Advanced):
to:
'''Step 4 of 8: New Fields''' (create them in this order or copy and paste if using using FileMaker Pro Advanced):
Changed lines 70-76 from:
'''New Scripts'''
to:
'''Step 5 of 8: New Scripts'''

-> Coming Soon.

-> Now return to the layouts created in step 3 and assign two script triggers to each of them except the last one (except for "Calendar Color Records Part 2") :
--> On RecordLoad  run the script "Load Calendar Layout"
--> On RecordCommit  run the script "Event On Commit"
May 19, 2014, at 06:24 PM by 50.159.68.116 -
Changed lines 21-49 from:
-> This is most easily done by creating the first layout listed below, deleting the header and footer part, and duplicating it to create the others. Here is how to create that first layout: Create the layout and then visit Layout Setup and uncheck the box beside "Show field frames when record is active". Base the layout on the Classic theme. Also uncheck the box to enable QuickFind. (If you want to search the calendar using QuickFind you can leave this enabled on the EventList layout, or use fmSearchResults to extend QuickFind. Do this after you've followed these instructions and are up and running.) Keep duplicating and renaming layouts making sure to switch "Show records from" to match the associated table shown in the list below.
to:
-> This is most easily done by creating the first layout listed below, deleting the header and footer part, and duplicating it to create the others. Here is how to create that first layout:

--> Create the layout and then visit Layout Setup and uncheck the box beside "Show field frames when record is active".

--> Base the layout on one of the themes you imported above. Also uncheck the box to enable QuickFind.

--> Switch the "Show records from" drop-down to make the layout based on "Calendar Interface" (all the layouts below will be based on this).

-> Keep duplicating and renaming layouts until you're through the list below. Don't rename any layouts now--even if you'd like to--you can rename them after you're up and running, providing your abide by a few rules [[Layout Names | here]]. Make sure layout names are spelled ''exactly'' as they are below.

-->Calendar - Day View\\
Calendar - Day View - so Side Menu\\
Calendar - Day Simple View\\
Calendar - Day Simple View - so Side Menu\\
Calendar - Week View\\
Calendar - Week View - so Side Menu\\
Calendar - Week Simple View\\
Calendar - Week Simple View - so Side Menu\\
Calendar - Month View\\
Calendar - Month View - so Side Menu\\
Calendar - Schedule View\\
Calendar - Schedule View - so Side Menu\\
Calendar - Grid View\\
Calendar - Grid View - so Side Menu\\
Calendar - Gantt View\\
Calendar - Gantt View - so Side Menu\\
Calendar Color Records Part 2

--> Lastly, please remove the script trigger from that last layout.
May 19, 2014, at 06:14 PM by 50.159.68.116 -
Changed line 13 from:
'''Step 2 of 8: New Theme(s)'''
to:
'''Step 2 of 8: Import Theme(s)'''
May 19, 2014, at 06:13 PM by 50.159.68.116 -
Changed lines 13-17 from:
'''Step 2 of 7: New Blank Layouts'''
to:
'''Step 2 of 8: New Theme(s)'''

-> In your file, select Manage / Themes from FileMaker's File menu and click the "Import" button. Select the the new copy of the calendar you've downloaded and you'll see a couple themes to import. Import all the Web Direct themes (beginning "SC Web Direct Cal") you'd like to use in your file. You'll pick one of these themes to get started with in the next step below.

'''Step 3 of 8
: New Blank Layouts'''
May 19, 2014, at 06:08 PM by 50.159.68.116 -
Changed lines 13-16 from:
'''New Blank Layouts'''

-> Coming Soon.
to:
'''Step 2 of 7: New Blank Layouts'''

-> FileMaker is really sensitive to the order of the following operations. In this step we'll create blank layouts with the correct layout names, and then after we've pasted in the scripts that refer to these layouts we'll return to paste the calendar objects on to these layouts in step 5.

-> This is most easily done by creating the first layout listed below, deleting the header and footer part, and duplicating it to create the others. Here is how to create that first layout: Create the layout and then visit Layout Setup and uncheck the box beside "Show field frames when record is active". Base the layout on the Classic theme. Also uncheck the box to enable QuickFind. (If you want to search the calendar using QuickFind you can leave this enabled on the EventList layout, or use fmSearchResults to extend QuickFind. Do this after you've followed these instructions and are up and running.) Keep duplicating and renaming layouts making sure to switch "Show records from" to match the associated table shown in the list below
.
Added lines 39-42:

'''New Scripts'''

'''Changed Scripts'''
April 29, 2014, at 02:55 PM by 107.77.75.119 -
Added lines 13-16:
'''New Blank Layouts'''

-> Coming Soon.

Added lines 37-45:

'''New Layout Contents'''

-> Coming Soon.

'''Change the contents of existing layouts.'''

-> Assign Colors

April 29, 2014, at 04:36 AM by 50.132.85.96 -
Changed line 28 from:
CalendarInterface::ColorContainerHoldersGlob\\
to:
CalendarInterface::ColorContainerHoldersGlob
April 29, 2014, at 04:35 AM by 50.132.85.96 -
Added lines 30-32:
-> CalendarRows::disp\\
CalendarRows::clr\\
CalendarRows::bdr\\
April 29, 2014, at 04:07 AM by 50.132.85.96 -
Changed lines 27-28 from:
CalendarInterface:: ThreeMoDisplayFocusGlob\\
to:
CalendarInterface::ThreeMoDisplayFocusGlob\\
CalendarInterface::ColorContainerHoldersGlob\\
April 29, 2014, at 03:59 AM by 50.132.85.96 -
Changed lines 35-39 from:
-> The Web Direct calendar introduces a new way for us to render our event colors: we're now doing these as container fields instead of colored text. While our new Pro Calendar uses this in both the Desktop and Web Direct layouts, it's a pretty laborious mod to make to an existing calendar as you have to touch every event color field on the Desktop calendar layout.

-> Accordingly, the integration instructions about will let
you run both color methods together: using colored text for your Desktop events and containers for your Web Direct displays.

-> To prevent you from having to keep these two color methods
in sync...
to:
-> The Web Direct calendar introduces a new way for us to render our event colors: we're now doing these as container fields instead of colored text. You can switch the desktop calendar to use this method as well--and you'll want to so that you only have one place to define color.

-> To accomplish this, change your definition for the
field CalendarRows::CalendarColorReptCalc to use the definition from our latest Pro Calendar. Once you do, you'll want to assign some colors as the ones you've previously assigned won't work anymore. In the desktop calendar (you can't assign colors in Web Direct) click on Settings in the left hand sidebar and then click "assign colors". Assign colors to your items then click "apply and close" and continue with the instructions below.

-> In order to get your new colors looking correct in the Desktop calendar layouts you'll need to make a formatting change to each tab of the calendar
. (better video coming)

http://screencast.com/t/vJhYGBKOgciS
April 29, 2014, at 03:37 AM by 50.132.85.96 -
Changed lines 33-39 from:
'''Colors'''
to:
'''Colors'''

-> The Web Direct calendar introduces a new way for us to render our event colors: we're now doing these as container fields instead of colored text. While our new Pro Calendar uses this in both the Desktop and Web Direct layouts, it's a pretty laborious mod to make to an existing calendar as you have to touch every event color field on the Desktop calendar layout.

-> Accordingly, the integration instructions about will let you run both color methods together: using colored text for your Desktop events and containers for your Web Direct displays.

-> To prevent you from having to keep these two color methods in sync...
April 29, 2014, at 03:25 AM by 50.132.85.96 -
Changed lines 19-27 from:
CalendarInterface::TimeDisplayCalc_Hour13
CalendarInterface::TimeDisplayCalc_Minute13
CalendarInterface::ThreeMoDisplay13Calc
CalendarInterface::Preview_SelectedColorFieldValue_Glob
CalendarInterface::SourceDisplayCalc
CalendarInterface::checkGreen
CalendarInterface::checkGrey
CalendarInterface::SourceDisplayIconCalc
CalendarInterface:: ThreeMoDisplayFocusGlob
to:
CalendarInterface::TimeDisplayCalc_Hour13\\
CalendarInterface::TimeDisplayCalc_Minute13\\
CalendarInterface::ThreeMoDisplay13Calc\\
CalendarInterface::Preview_SelectedColorFieldValue_Glob\\
CalendarInterface::SourceDisplayCalc\\
CalendarInterface::checkGreen\\
CalendarInterface::checkGrey\\
CalendarInterface::SourceDisplayIconCalc\\
CalendarInterface:: ThreeMoDisplayFocusGlob\\
April 29, 2014, at 03:25 AM by 50.132.85.96 -
Changed lines 7-13 from:
New Fields (create them in this order or copy and paste if using using FileMaker Pro Advanced):
to:
-> Coming Soon.

'''Table Occurrence Changes'''

-> Coming Soon.

'''New Fields'''
(create them in this order or copy and paste if using using FileMaker Pro Advanced):
Changed lines 15-18 from:
CalendarInterface::borderIMG_Overlap
CalendarInterface::borderIMG_Line
CalendarInterface::borderIMG_Line_Overlap
CalendarInterface::border
to:
-> CalendarInterface::borderIMG_Overlap\\
CalendarInterface::borderIMG_Line\\
CalendarInterface::borderIMG_Line_Overlap\\
CalendarInterface::border\\
Added line 28:
April 28, 2014, at 11:30 PM by 50.132.85.96 -
Added lines 20-22:
CalendarInterface::SourceDisplayIconCalc
CalendarInterface:: ThreeMoDisplayFocusGlob

April 28, 2014, at 11:03 PM by 50.132.85.96 -
Changed lines 13-19 from:
to:
CalendarInterface::TimeDisplayCalc_Hour13
CalendarInterface::TimeDisplayCalc_Minute13
CalendarInterface::ThreeMoDisplay13Calc
CalendarInterface::Preview_SelectedColorFieldValue_Glob
CalendarInterface::SourceDisplayCalc
CalendarInterface::checkGreen
CalendarInterface::checkGrey
April 28, 2014, at 10:55 PM by 50.132.85.96 -
Changed lines 7-13 from:
Work in process
to:
New Fields (create them in this order or copy and paste if using using FileMaker Pro Advanced):
 
CalendarInterface::borderIMG_Overlap
CalendarInterface::borderIMG_Line
CalendarInterface::borderIMG_Line_Overlap
CalendarInterface::border

April 28, 2014, at 10:30 PM by 50.132.85.96 -
Changed lines 5-11 from:
sfbf
to:
'''Overall Instructions.'''

Work in process

!! Changes to Pro Calendar Stuff.

'''Colors'''
April 28, 2014, at 10:23 PM by 50.132.85.96 -
Changed line 1 from:
Note: SeedCode's [[http:www.seedcode.com/preview-seedcode-calendar-web-direct/ | Calendar for Web Direct]] is almost ready. [[http://www.seedcode.com/newsletter-signup/ | Signup for our newsletter]] to be the first to know when it's launched.
to:
Note: SeedCode's [[http://www.seedcode.com/preview-seedcode-calendar-web-direct/ | Calendar for Web Direct]] is almost ready. [[http://www.seedcode.com/newsletter-signup/ | Signup for our newsletter]] to be the first to know when it's launched.
April 28, 2014, at 10:23 PM by 50.132.85.96 -
Changed line 1 from:
Note: SeedCode's [[/preview-seedcode-calendar-web-direct/ | Calendar for Web Direct]] is almost ready. [[http://www.seedcode.com/newsletter-signup/ | Signup for our newsletter]] to be the first to know when it's launched.
to:
Note: SeedCode's [[http:www.seedcode.com/preview-seedcode-calendar-web-direct/ | Calendar for Web Direct]] is almost ready. [[http://www.seedcode.com/newsletter-signup/ | Signup for our newsletter]] to be the first to know when it's launched.
April 28, 2014, at 10:22 PM by 50.132.85.96 -
Added lines 1-5:
Note: SeedCode's [[/preview-seedcode-calendar-web-direct/ | Calendar for Web Direct]] is almost ready. [[http://www.seedcode.com/newsletter-signup/ | Signup for our newsletter]] to be the first to know when it's launched.

!! How can I add the Web Direct Calendar to my existing calendar deployment?